To Whom It May Concern:

Pursuant to the Georgia Open Records Act, I hereby request the following records:

A copy of the PUD and the approved Master Stormwater Report for Braselton Village.

The requested documents will be made available to the general public, and this request is not being made for commercial purposes.

In the event that there are fees, I would be grateful if you would inform me of the total charges in advance of fulfilling my request. I would prefer the request filled electronically, by e-mail attachment if available or CD-ROM if not.

Thank you in advance for your anticipated cooperation in this matter. I look forward to receiving your response to this request within 3 business days, as the statute requires.

Sincerely,

Breck Delaney

From: Braselton City Clerk

Breck,
The reports are being digitized and I can send via email by this Friday.
I do not know what you mean by "PUD." What document(s) are you requesting?

[cid:image002.jpg@01DA4DE5.3E6AB100]
Sandy Weinel, P.E.
Public Works Director
[cid:image003.png@01DA4DE5.3E6AB100]

706-921-4020
[cid:image004.png@01DA4DE5.3E6AB100]

Post Office Box 306 4982 Highway 53, Braselton, GA 30517 <https://maps.google.com/?q=%20Post%20Office%20Box%20306%209924%20Davis%20Street,%20Ste%208%20Braselton,%20GA%2030517>
[cid:image005.png@01DA4DE5.3E6AB100]

sweinel@braselton.net <mailto:sweinel@braselton.net>
[cid:image006.png@01DA4DE5.3E6AB100]

www.braselton.net <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2f%2520www.braselton.net%2f&c=E,1,eBMWQEL20IHDbRyAYuxPErY72oKmWmy-kNtPBJB3vPGamZqi7UgKaiTbbkgRyzVWnP0MqPg9b--zJnV59ufOPUe3Yl3ZcU1LtIxB7tLW2MAQXtCt&typo=1>

From: Breck Delaney

Hi Sandy,

I just left you a voicemail regarding this site. By "PUD", I meant the planned unit development, Braselton Village. We are currently working on due diligence for an outparcel within Braselton Village that borders Hwy 211. I wanted to see if you could provide me with a document that contains the regulations, such as setbacks, parking, etc., for this specific PUD as it doesn't seem to be accessible on the town website. I also wanted to follow up with you about a water and sewer availability request I sent Elma last week that she forwarded to you. If you'd prefer to speak with me on the phone (843-368-5238) or via email (bdelaney0908@fg-inc.net), please do as I know this message is a bit all over the place.

Thank you!

Breck Delaney

From: Braselton City Clerk

The request for approved plans for that portion of the CE PUD will need to be provided by Planning and Development. I’ve copied that Director on this email. He can also explain the nuances of the PUD to you.

Jennifer Scott, Braselton Town Manager

From: Braselton City Clerk

Our Planning & Development Director says he has a meeting scheduled with you for 1/31 at which he is supposed to provide you with the PUD information and go over all the information related to this specific site plan. Are you asking for him to provide it to you via email in lieu of the meeting?

Jennifer Scott, Manager & Clerk
Town of Braselton
706-654-5720
jscott@braselton.net

From: Braselton City Clerk

Ok. That makes a difference in which stormwater report I send. I am out of the office today but can reach out to you by Friday.
Sandy Weinel

Get Outlook for iOS<https://aka.ms/o0ukef>

From: Breck Delaney

Thank you, Sandy and Jennifer!

Jennifer, we would still like to have the scheduled meeting although, if possible, we would like to have the PUD information beforehand to be able to review and inquire about during the meeting.

Thanks again,

Breck Delaney

From: Braselton City Clerk

Ok – there will be charges for him to pull and scan all that information ahead of time. You do have a limit on how much you want to be charged?

Jennifer Scott, Manager & Clerk
Town of Braselton
706-654-5720
jscott@braselton.net

From: Braselton City Clerk

Breck,
Attached is the approved as-built hydrology study for the master pond of Braselton Village (Commercial). It was originally permitted as Chateau Village.

[cid:image001.jpg@01DA52B6.16660080]
Sandy Weinel, P.E.
Public Works Director
[cid:image002.png@01DA52B6.16660080]

706-921-4020
[cid:image003.png@01DA52B6.16660080]

Post Office Box 306 4982 Highway 53, Braselton, GA 30517 <https://maps.google.com/?q=%20Post%20Office%20Box%20306%209924%20Davis%20Street,%20Ste%208%20Braselton,%20GA%2030517>
[cid:image004.png@01DA52B6.16660080]

sweinel@braselton.net <mailto:sweinel@braselton.net>
[cid:image005.png@01DA52B6.16660080]

www.braselton.net <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2f%2520www.braselton.net%2f&c=E,1,eBMWQEL20IHDbRyAYuxPErY72oKmWmy-kNtPBJB3vPGamZqi7UgKaiTbbkgRyzVWnP0MqPg9b--zJnV59ufOPUe3Yl3ZcU1LtIxB7tLW2MAQXtCt&typo=1>

Files

pages

Close